I didn’t think the day would ever come when I could say the kitchen was finally done, but it is here! If you have followed my blog you will know that I have been renovating it in stages. The big thing I was waiting to do was the floor and then I could finish off the kickboards and trim and the peninsula.

Ceramic tiles before
Pantry wall subfloor - before
Broken ceramic tiles before
Broken and missing tiles - before

I actually didn’t mind the kitchen tiles when I moved in and had thought to save them. Phase one of my kitchen reno (the pantry wall) showed me that that would not be possible and they got further damaged with phase two and three. I had considered putting hardwood in the kitchen as well because having the same flooring as the adjacent rooms would make the space look bigger. Fortunately, I was forced to wait to get the floor done because I realized that it got quite cold there in the winter. So I changed my mind again and decided heated floors would be the way to go.

Plastic to contain tile dust
Plastic to contain dust from ceramic tile removal.

New in-floor heating and tiles...

The first order of business was to put up plastic and remove the old tiles. When the old ceramic tiles came up there were a couple layers of linoleum and sub-flooring.

Multi layers of flooring
Multi layers of linoleum and sub-flooring.
Old linoleum flooring
Old linoleum
heated floor
Heated floor wiring for thermostat
heated floor membrane
Heated floor membrane

The electrician came to install the wires for the thermostat and floor heating. I got my in-floor heat system from Wye River Flooring Co. When the sub floor was ready the  mat for the heating wires was laid and the wires installed. After the inspection, the tiles were laid and grouted.

In-floor heat and tiles
Wires in and tiles started.
Heated floors
Tiles done and grouted.

Peninsula, kick boards and trim done...

With the floor finally finished I was able to get the kick boards put on and the trim work done. Some bead board paneling and trim finished off the peninsula after the hardwood flooring was done in the dining room. And then I finally got to paint it!

Peninsula complete
Beadboard and trim finish off the peninsula.

Completed IKEA Kitchen...

IKEA kitchen complete
Counter-depth fridge replaced original in pantry wall so it doesn't stick out so much.
IKEA Kitchen
New gas stove with griddle.
Kitchen and dining room
Dishwasher moved to peninsula.
Kitchen back door
Step ladder, coat hook shelf and original art by garage back door.
IKEA kitchen complete
After
Flooring - after
After

Kitchen before... 2014...

Kitchen 2014
Flooring kitchen before

You can see the completed kitchen in the video below....

You can see the first three stages in the video below....